OEM and ODM adjustable bed bases, from 20 pcs per model
Yes, Kang Cai builds electric adjustable bed bases to your specification (OEM) or customizes one of our existing KD models (ODM). Orders start from 20 pcs per model, samples take about 3 weeks, and production takes about 45 days after the sample is approved.
OEM or ODM: which one fits your program?
| ODM | OEM | |
|---|---|---|
| Starting point | One of our KD models | Your design or specification |
| What you change | Fabric, branding, packaging | Structure, functions and everything above |
| Best for | Launching a line quickly with low risk | Brands with an existing design or strict requirements |
| Typical timeline | Sample in about 3 weeks | Depends on tooling; confirmed at quotation |
Most mattress brands start with ODM. It uses a frame that is already in production, so the first order can be small and the sample arrives faster.
What you can customize
| Item | Options |
|---|---|
| Size | Non-standard sizes are accepted and quoted separately |
| Upholstery | Fabric type and color, upholstered or exposed frame |
| Branding | Product labels and printed cartons with your brand |
How an OEM/ODM project runs
Inquiry
Send your target size, functions, quantity and destination market.
Specification and quote
We confirm the model, options and price per configuration.
Sample
About 3 weeks. You test it with your own mattress.
Production
About 45 days after sample approval and order confirmation.
Inspection and shipping
Our QC team inspects each order against an inspection checklist before packing.
Why work with Kang Cai
- Factory in Dongguan, founded in 2004, building adjustable beds since 2012.
- 25,000 m² factory and 150 employees.
- 13 granted Chinese patents: 9 held by the company and 4 by the inventor.
- The lifting system has passed 10,000+ aging test cycles.
- Warranty: 5 years on electric bed frames and 2 years on motors and power adapters, counted from the production date.
FAQ
What is the minimum order for an OEM adjustable bed base?
From 20 pcs per model. The exact minimum depends on the model and options, and is confirmed in the quote.
How long does a sample take?
About 3 weeks after the specification is confirmed.
What is the production lead time?
About 45 days after sample approval and order confirmation.
Can you make a non-standard size?
Yes. Send us the mattress size you need and we quote it separately.
Do your bases have UL, ETL or FCC certification?
Certification coverage is confirmed per model at quotation. Ask us for the certificates that apply to the model you are sourcing.